Piling Work
Bored cast-in-situ piling, rig support, foundation execution and pile testing support for solar and industrial structures.

Piling, foundations, trenching, control-room works, roads, fencing and drainage—planned around the needs of energy infrastructure.
Discuss Civil ScopeA solar plant needs more than modules and cables. Ground conditions, foundations, access, drainage and security all affect execution and long-term operation.

Bored cast-in-situ piling, rig support, foundation execution and pile testing support for solar and industrial structures.

MMS, SCB/SMB, inverter and junction-box foundations, plus cable trenching and backfilling.

RCC foundations, block work, plastering, flooring, finishing and cable-trench integration for control rooms.

Transformer, inverter, switchyard and control-room foundations with associated fencing, roads and drainage.

Chain-link, barbed-wire and solar fencing with posts and concrete foundations for site security.

WBM/WMM/GSB and bituminous road work, plus site drainage, slope protection, lining and flow finishing.
The company presentation outlines a clear process from site marking to flow testing.
Layout preparation to suit approved drawings and natural slope.
Earthwork to required drain width and depth.
Compaction, leveling and suitable concrete, masonry or stone lining.
Slope protection, finishing and verification of smooth water flow.